Manifold Hydraulic / High Pressure / Space Saving / Outlets on 3 Sides (Part Numbers - CAD Download)

Part Number

Once your search is narrowed to one product,
the corresponding part number is displayed here.

Manifold Hydraulic/High Pressure/Space Saving/Outlets on 3 Sides:Related Image

TypeMaterialSurface TreatmentMax. Operating Pressure
BMAHEN 1.0038 Equiv.Trivalent Chromate34.5MPa
≈350kgf/cm2 or less

Specifications

Part Number-Q-R-S
TypeMounting HoleNumber of Circuits
BMAHZT4-Q2-R2-S2
G-BMAHZT4-Q2-R2-S2(G Thread)
Part NumberRc (PT) SelectionPNumber of Pitches
N
Total Number of Q, R and S ThreadsUnit Price
TypeMounting Hole SelectionNumber of CircuitsQ, R, S
BMAHZA (Counterbore)
NA (Through Hole)
T (Tapped)
ZT (Counterbore Tapped)
11 (1/8)
2
(1/4)
3 (3/8)
4 (1/2)
5003
216
329
4312
5415
6518
By inserting "G-" before part number, the thread type can be changed to the G (PF) Thread as part of ordering. (Ex.: G-BMAH) For ordering, see the Ordering Example.
For Q, R and S, specify 1, 2, 3, or 4 indicated before ( ).
Only 6 Circuit Type has an additional mounting hole at the midpoint of the overall length.

Part Number:  

    3D preview is not available, because the part number has not yet been determined.

  • In order to open the 3D preview, the part number must be fixed.
Loading...
Part Number
BMAHNA1-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
BMAHNA2-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
BMAHNA3-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
BMAHNA4-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
BMAHNA5-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
BMAHNA6-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
BMAHT1-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
BMAHT2-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
BMAHT3-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
BMAHT4-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
BMAHT5-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
BMAHT6-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
BMAHZA1-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
BMAHZA2-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
BMAHZA3-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
BMAHZA4-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
BMAHZA5-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
BMAHZA6-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
BMAHZT1-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
BMAHZT2-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
BMAHZT3-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
BMAHZT4-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
BMAHZT5-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
BMAHZT6-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
G-BMAHNA1-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
G-BMAHNA2-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
G-BMAHNA3-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
G-BMAHNA4-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
G-BMAHNA5-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
G-BMAHNA6-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
G-BMAHT1-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
G-BMAHT2-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
G-BMAHT3-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
G-BMAHT4-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
G-BMAHT5-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
G-BMAHT6-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
G-BMAHZA1-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
G-BMAHZA2-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
G-BMAHZA3-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
G-BMAHZA4-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
G-BMAHZA5-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
G-BMAHZA6-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
G-BMAHZT1-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
G-BMAHZT2-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
G-BMAHZT3-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
G-BMAHZT4-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
G-BMAHZT5-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
G-BMAHZT6-Q[1,​2,​3,​4]-R[1,​2,​3,​4]-S[1,​2,​3,​4]
Part NumberMinimum order quantityVolume Discount
Standard
Shipping Days
?
RoHSNumber of Circuits
(Circuits)
Thread Size / Type Mounting Hole Change Select a value for PT/PF Thread Dia. on Q (in Drawing). [Q] 1(1/8) 2(1/4) 3(3/8) 4(1/2) Select a value for PT/PF Thread Dia. on R (in Drawing). [R] 1(1/8) 2(1/4) 3(3/8) 4(1/2) Select a value for PT/PF Thread Dia. on S (in Drawing). [S] 1(1/8) 2(1/4) 3(3/8) 4(1/2)
1 15 Days 101Standard Thread {PT, m (Coarse) Thread}NA (Through)1 ~ 41 ~ 41 ~ 4
1 15 Days 102Standard Thread {PT, m (Coarse) Thread}NA (Through)1 ~ 41 ~ 41 ~ 4
1 15 Days 103Standard Thread {PT, m (Coarse) Thread}NA (Through)1 ~ 41 ~ 41 ~ 4
1 15 Days 104Standard Thread {PT, m (Coarse) Thread}NA (Through)1 ~ 41 ~ 41 ~ 4
1 15 Days 105Standard Thread {PT, m (Coarse) Thread}NA (Through)1 ~ 41 ~ 41 ~ 4
1 15 Days 106Standard Thread {PT, m (Coarse) Thread}NA (Through)1 ~ 41 ~ 41 ~ 4
1 15 Days 101Standard Thread {PT, m (Coarse) Thread}T (Tapped)1 ~ 41 ~ 41 ~ 4
1 15 Days 102Standard Thread {PT, m (Coarse) Thread}T (Tapped)1 ~ 41 ~ 41 ~ 4
1 15 Days 103Standard Thread {PT, m (Coarse) Thread}T (Tapped)1 ~ 41 ~ 41 ~ 4
1 15 Days 104Standard Thread {PT, m (Coarse) Thread}T (Tapped)1 ~ 41 ~ 41 ~ 4
1 15 Days 105Standard Thread {PT, m (Coarse) Thread}T (Tapped)1 ~ 41 ~ 41 ~ 4
1 15 Days 106Standard Thread {PT, m (Coarse) Thread}T (Tapped)1 ~ 41 ~ 41 ~ 4
1 15 Days 101Standard Thread {PT, m (Coarse) Thread}ZA (Counterbore)1 ~ 41 ~ 41 ~ 4
1 15 Days 102Standard Thread {PT, m (Coarse) Thread}ZA (Counterbore)1 ~ 41 ~ 41 ~ 4
1 15 Days 103Standard Thread {PT, m (Coarse) Thread}ZA (Counterbore)1 ~ 41 ~ 41 ~ 4
1 15 Days 104Standard Thread {PT, m (Coarse) Thread}ZA (Counterbore)1 ~ 41 ~ 41 ~ 4
1 15 Days 105Standard Thread {PT, m (Coarse) Thread}ZA (Counterbore)1 ~ 41 ~ 41 ~ 4
1 15 Days 106Standard Thread {PT, m (Coarse) Thread}ZA (Counterbore)1 ~ 41 ~ 41 ~ 4
1 15 Days 101Standard Thread {PT, m (Coarse) Thread}ZT (Counterbore Tapped)1 ~ 41 ~ 41 ~ 4
1 15 Days 102Standard Thread {PT, m (Coarse) Thread}ZT (Counterbore Tapped)1 ~ 41 ~ 41 ~ 4
1 15 Days 103Standard Thread {PT, m (Coarse) Thread}ZT (Counterbore Tapped)1 ~ 41 ~ 41 ~ 4
1 15 Days 104Standard Thread {PT, m (Coarse) Thread}ZT (Counterbore Tapped)1 ~ 41 ~ 41 ~ 4
1 15 Days 105Standard Thread {PT, m (Coarse) Thread}ZT (Counterbore Tapped)1 ~ 41 ~ 41 ~ 4
1 15 Days 106Standard Thread {PT, m (Coarse) Thread}ZT (Counterbore Tapped)1 ~ 41 ~ 41 ~ 4
1 9 Days 101G (PF) ThreadNA (Through)1 ~ 41 ~ 41 ~ 4
1 9 Days 102G (PF) ThreadNA (Through)1 ~ 41 ~ 41 ~ 4
1 9 Days 103G (PF) ThreadNA (Through)1 ~ 41 ~ 41 ~ 4
1 9 Days 104G (PF) ThreadNA (Through)1 ~ 41 ~ 41 ~ 4
1 9 Days 105G (PF) ThreadNA (Through)1 ~ 41 ~ 41 ~ 4
1 9 Days 106G (PF) ThreadNA (Through)1 ~ 41 ~ 41 ~ 4
1 9 Days 101G (PF) ThreadT (Tapped)1 ~ 41 ~ 41 ~ 4
1 9 Days 102G (PF) ThreadT (Tapped)1 ~ 41 ~ 41 ~ 4
1 9 Days 103G (PF) ThreadT (Tapped)1 ~ 41 ~ 41 ~ 4
1 9 Days 104G (PF) ThreadT (Tapped)1 ~ 41 ~ 41 ~ 4
1 9 Days 105G (PF) ThreadT (Tapped)1 ~ 41 ~ 41 ~ 4
1 9 Days 106G (PF) ThreadT (Tapped)1 ~ 41 ~ 41 ~ 4
1 9 Days 101G (PF) ThreadZA (Counterbore)1 ~ 41 ~ 41 ~ 4
1 9 Days 102G (PF) ThreadZA (Counterbore)1 ~ 41 ~ 41 ~ 4
1 9 Days 103G (PF) ThreadZA (Counterbore)1 ~ 41 ~ 41 ~ 4
1 9 Days 104G (PF) ThreadZA (Counterbore)1 ~ 41 ~ 41 ~ 4
1 9 Days 105G (PF) ThreadZA (Counterbore)1 ~ 41 ~ 41 ~ 4
1 9 Days 106G (PF) ThreadZA (Counterbore)1 ~ 41 ~ 41 ~ 4
1 9 Days 101G (PF) ThreadZT (Counterbore Tapped)1 ~ 41 ~ 41 ~ 4
1 9 Days 102G (PF) ThreadZT (Counterbore Tapped)1 ~ 41 ~ 41 ~ 4
1 9 Days 103G (PF) ThreadZT (Counterbore Tapped)1 ~ 41 ~ 41 ~ 4
1 9 Days 104G (PF) ThreadZT (Counterbore Tapped)1 ~ 41 ~ 41 ~ 4
1 9 Days 105G (PF) ThreadZT (Counterbore Tapped)1 ~ 41 ~ 41 ~ 4
1 9 Days 106G (PF) ThreadZT (Counterbore Tapped)1 ~ 41 ~ 41 ~ 4

Loading...

  1. 1

Basic information

Shape T-Shaped Hole Material EN 1.0038 Equiv. Surface Treatment Trivalent Chromate
Block Size(mm) 50 x 50 Pitch P(mm) 50 Pitch Standard / Configurable Fixed Type
Application For hydraulic / Water Pressure

Tech Support

Technical Support
Tel:+49 69 668173-0 / FAX:+49 69 668173-360