Manufacturer part number: SPNUBHI-STU-M10-32
Brand: SUNCO
Price: 2.29 €
Delivery time: 6 Days
Nominal of Thread (M): 10
Material: [Steel] Steel
Surface Treatment: [Bright Chromate Plating] Bright Chromate Plating
Nominal Dimensions: 32A
Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
SPNUBHI-STU-M10-32
Part Number
|
---|
SPNUBHI-STU-M10-32 |
Part Number |
Standard Unit Price
| Minimum order quantity | Volume Discount | RoHS | Nominal of Thread (M) | Material | Surface Treatment | Nominal Dimensions | |
---|---|---|---|---|---|---|---|---|---|
2.29 € | 1 | Available | 6 Days | - | 10 | [Steel] Steel | [Bright Chromate Plating] Bright Chromate Plating | 32A |
Loading...
Thread ridge Type | Metric Coarse | Sales Unit | Low Quantity (can be purchased from one) |
---|
This page is U Bolt, for Steel Pipes, with Nut, part number SPNUBHI-STU-M10-32.
You can find the detail information about specifications and dimensions on part number SPNUBHI-STU-M10-32.
Configure
Basic Attributes
Type
Nominal of Thread (M)
Material
Surface Treatment
Nominal Dimensions
Filter by standard shipping days
Optional Attributes
Part Number |
---|
SPNUBHI-STAY-M10-20 |
SPNUBHI-STAY-M10-25 |
SPNUBHI-STAY-M10-32 |
SPNUBHI-STU-M12-100 |
SPNUBHI-STU-M12-125 |
SPNUBHI-STU-M12-200 |
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Standard Shipping Days ? | RoHS | Nominal of Thread (M) | Material | Surface Treatment | Nominal Dimensions |
---|---|---|---|---|---|---|---|---|---|
2.60 € | 1 | Available | 6 Days | - | 10 | [Steel] Steel | Molten Zinc Plating | 20A | |
2.77 € | 1 | Available | 6 Days | - | 10 | [Steel] Steel | Molten Zinc Plating | 25A | |
2.83 € | 1 | Available | 6 Days | - | 10 | [Steel] Steel | Molten Zinc Plating | 32A | |
6.71 € | 1 | 6 Days | - | 12 | [Steel] Steel | [Bright Chromate Plating] Bright Chromate Plating | 100A | ||
5.26 € | 1 | 6 Days | - | 12 | [Steel] Steel | [Bright Chromate Plating] Bright Chromate Plating | 125A | ||
8.63 € | 1 | 6 Days | - | 12 | [Steel] Steel | [Bright Chromate Plating] Bright Chromate Plating | 200A |