Manufacturer part number: AGRERS6R1
Brand: NACHI(FUJIKOSHI)
Price: 115.09 €
Delivery time: 6 Days
Blade diameter (D): 6 φ
R Size: 1 mm
Blade length (l): 15 mm
Number of flutes: 4 sheet
Overall Length (L): 60 mm
Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
AGRERS6R1
Part Number
|
---|
AGRERS6R1 |
Part Number |
Standard Unit Price
| Minimum order quantity | Volume Discount | Blade diameter (D) (φ) | R Size (mm) | Blade length (l) (mm) | Number of flutes (sheet) | Overall Length (L) (mm) | Shank diameter (d) (mm) | |
---|---|---|---|---|---|---|---|---|---|---|
115.09 € | 1 | 6 Days | 6 | 1 | 15 | 4 | 60 | 6 |
Loading...
work material | General Steel / Quenched and tempered steel / Stainless Steel / Cast Iron / Aluminum / Titanium / Copper | Tool Material Type | Cobalt HSS | Machining Application | Plane / Side / Curved surface |
---|---|---|---|---|---|
Coating | TiAlN | Torsion Angle (θ) | Standard torsion / (30-40°) |
This page is AG Mill, Roughing, Radius AGRERS-R, part number AGRERS6R1.
You can find the detail information about specifications and dimensions on part number AGRERS6R1.
Configure
Basic Attributes
Type
Blade diameter (D)(φ)
R Size(mm)
Blade length (l)(mm)
Number of flutes(sheet)
Overall Length (L)(mm)
Shank diameter (d)(mm)
Filter by standard shipping days
Optional Attributes
Part Number |
---|
AGRERS10R2 |
AGRERS12R1 |
AGRERS12R1.5 |
AGRERS12R2 |
AGRERS8R0.5 |
AGRERS8R1 |
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Standard Shipping Days ? | Blade diameter (D) (φ) | R Size (mm) | Blade length (l) (mm) | Number of flutes (sheet) | Overall Length (L) (mm) | Shank diameter (d) (mm) |
---|---|---|---|---|---|---|---|---|---|---|
136.57 € | 1 | 8 Days | 10 | 2 | 25 | 4 | 75 | 10 | ||
129.30 € | 1 | 6 Days | 12 | 1 | 30 | 4 | 80 | 12 | ||
129.30 € | 1 | 6 Days | 12 | 1.5 | 30 | 4 | 80 | 12 | ||
123.95 € | 1 | 8 Days | 12 | 2 | 30 | 4 | 80 | 12 | ||
127.51 € | 1 | 6 Days | 8 | 0.5 | 20 | 4 | 65 | 10 | ||
127.51 € | 1 | 6 Days | 8 | 1 | 20 | 4 | 65 | 10 |