Manufacturer part number: S-AM-50
Brand: SANKO MFG
Price: 1,109.42 €
Delivery time: 8 Days
Blade diameter (D): 50 φ
Blade length (ℓ): 120 mm
Number of flutes: 6 sheet
Shank diameter (d): 42 mm
Overall Length (L): 240 mm
Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
S-AM-50
Part Number
|
---|
S-AM-50 |
Part Number |
Standard Unit Price
| Minimum order quantity | Volume Discount | Blade diameter (D) (φ) | Blade length (ℓ) (mm) | Number of flutes (sheet) | Shank diameter (d) (mm) | Overall Length (L) (mm) | |
---|---|---|---|---|---|---|---|---|---|
1,109.42 € | 1 | 8 Days | 50 | 120 | 6 | 42 | 240 |
Loading...
work material | Carbon steel, alloy steel and tool steel / Quenched and tempered steel (30 to 60 HRC) / Stainless Steel / Aluminum | Blade shape type | Roughing | Tool Material Type | Cobalt HSS |
---|---|---|---|---|---|
Machining Application | Plane / Side / Groove / Inclined Cuts | Coating | TiCN | Torsion Angle (θ) | Standard Helix (30˚ to 40˚) |
Base Blade Y/N | Available |
This page is S-αM S-Coated Alpha Nick Regular Blade, part number S-AM-50.
You can find the detail information about specifications and dimensions on part number S-AM-50.
Configure
Basic Attributes
Type
Blade diameter (D)(φ)
Blade length (ℓ)(mm)
Number of flutes(sheet)
Shank diameter (d)(mm)
Overall Length (L)(mm)
Filter by standard shipping days
Optional Attributes
Part Number |
---|
S-AM-10 |
S-AM-12 |
S-AM-14 |
S-AM-15 |
S-AM-16 |
S-AM-18 |
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Standard Shipping Days ? | Blade diameter (D) (φ) | Blade length (ℓ) (mm) | Number of flutes (sheet) | Shank diameter (d) (mm) | Overall Length (L) (mm) |
---|---|---|---|---|---|---|---|---|---|
85.15 € | 1 | 8 Days | 10 | 35 | 4 | 10 | 100 | ||
117.54 € | 1 | 8 Days | 12 | 45 | 4 | 12 | 125 | ||
132.59 € | 1 | 8 Days | 14 | 45 | 4 | 16 | 145 | ||
139.76 € | 1 | 8 Days | 15 | 55 | 4 | 16 | 155 | ||
144.21 € | 1 | 8 Days | 16 | 55 | 4 | 16 | 155 | ||
155.32 € | 1 | 8 Days | 18 | 55 | 4 | 16 | 155 |