Manufacturer part number: CD1.6-4CB
Brand: IWATA TOOL
Price: 70.76 €
Delivery time: 10 Days
blade diameter: 1.6 mm
shank diameter: 4 mm
Overall Length L: 35.5 mm
Blade Length: 2 mm
JIS: JISA
Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
CD1.6-4CB
Part Number
|
---|
CD1.6-4CB |
Part Number |
Standard Unit Price
| Minimum order quantity | Volume Discount | blade diameter (mm) | shank diameter (mm) | Overall Length L (mm) | Blade Length (mm) | JIS | |
---|---|---|---|---|---|---|---|---|---|
70.76 € | 1 | Available | 10 Days | 1.6 | 4 | 35.5 | 2 | JISA |
Loading...
Application | Centering (Positioning) | Both square (θ) | 60 | work material | General Steel / Quenched and tempered steel / High Hardness Steel / Stainless Steel / Cast Iron / Aluminum / Titanium / Copper / Resin |
---|---|---|---|---|---|
Single blade, two blades | Double-edged | Peripheral Blade Y/N | N/A | Tool Material Type | Carbide |
Coating Y/N | N/A | Rotation Direction | Right blade |
This page is Carbide Center Drill Type A 60°, part number CD1.6-4CB.
You can find the detail information about specifications and dimensions on part number CD1.6-4CB.
Configure
Basic Attributes
Type
blade diameter(mm)
shank diameter(mm)
Overall Length L(mm)
Blade Length(mm)
Filter by standard shipping days
Optional Attributes
Part Number |
---|
CD1.0-4CB |
CD1.5-5CB |
CD2.0-5CB |
CD2.0-6CB |
CD2.5-6.3CB |
CD2.5-6CB |
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Standard Shipping Days ? | blade diameter (mm) | shank diameter (mm) | Overall Length L (mm) | Blade Length (mm) | JIS |
---|---|---|---|---|---|---|---|---|---|
70.76 € | 1 | Available | 6 Days | 1 | 4 | 35 | 1.3 | Old JIS1 | |
78.51 € | 1 | Available | 6 Days | 1.5 | 5 | 40 | 1.9 | Old JIS1 | |
78.51 € | 1 | Available | 10 Days | 2 | 5 | 40 | 2.6 | JISA | |
95.97 € | 1 | Available | 15 Days | 2 | 6 | 45 | 2.6 | Old JIS1 | |
115.38 € | 1 | Available | 6 Days | 2.5 | 6.3 | 45 | 3.2 | JISA | |
95.97 € | 1 | Available | 10 Days | 2.5 | 6 | 45 | 3.2 | - |